Construction of Eliwana and Flying Fish 220/33KV Substations

Construction of Eliwana and Flying Fish 220/33KV Substations

PROJECT OVERVIEW Fortescue is committed to decarbonising its operations in mining, port, rail, non-process Infrastructure (NPI) and mobile fleet in the Pilbara in Western Australia. Fortescue’s decarbonisation plan includes development of green power generation, which consists of 2-3 GW of renewable (wind and solar) energy generation and battery storage; the renewable power generated will be […]

Goyder Wind Farm Mechanical Completion Walkdown

Goyder Wind Farm Mechanical Completion Walkdown

PROJECT OVERVIEW Goyder South Stage 1 is the first stage of Neoen’s Goyder Renewables Zone. GE Renewable Energy Australia and Elecnor Group’s Green Light Contractors are the EPC Consortium partners for Stages 1A and 1B, comprising 38 and 37 x 5.5MW wind turbine generators respectively. GE Australia is supplying, installing, commissioning, and testing the wind […]

Construction of the 220 66kv FMG Kanyirri substation and associated 66kv distribution cable to hidden tiger substation

Construction of the 220 66kv FMG Kanyirri substation and associated 66kv distribution cable to hidden tiger substation

PROJECT OVERVIEW The 220/66kV Kanyirri Substation and associated 66kV Distribution forms part of FMG’s new renewable network and will feed FMG’s Port operations in Port Hedland. SCOPE OF WORK Construction of the 220/66kV Kanyirri Substation and the associated 66KV distribution cable system out to Hidden Tiger Substation Kanyirri Substation Scope included: Procurement of all substation […]

Client Representation for the Hazelwoood Battery Energy Storage System HBESS Project

Client Representation for the Hazelwoood Battery Energy Storage System HBESS Project

PROJECT OVERVIEW The primary objective of constructing the Hazelwood Battery Energy Storage System, which has a power capacity & energy storage capacity of 150MW and 150MWh respectively, is to strengthen the stability of Victoria’s electrical grid. This particular initiative plays a crucial role in expanding the state’s energy resources and enhancing the reliability of the […]

Inpex Ichthys LNG 48 Month Inspection and Maintenance – 6.6KV Ship Loading Switchboard

Inpex Ichthys LNG 48 Month Inspection and Maintenance – 6.6KV Ship Loading Switchboard

PROJECT OVERVIEW Ichthys LNG onshore process facilities at Bladin Point near Darwin cools gas from the Ichthys Field and transforms it into liquid for transport. Ichthys LNG’s onshore processing facilities include: two LNG processing trains, LPG and condensate plants, product storage tanks, a combined cycle power plant, administration facilities, utilities and a product load out […]

EPC of Virtual Power Plants for Schools (VPP4S)

EPC of Virtual Power Plants for Schools (VPP4S)

Design, supply, installation and commissioning – Battery Energy Storage PROJECT OVERVIEW Baldja, a majority indigenous-owned Incorporated Joint Venture between RSGx, Kardan Construction and Wilco Electrical, was selected to complete works at two schools in Western Australia. The project was for the design, supply, installation and commissioning of a Battery Energy Storage System (BESS) at the […]

Construction and commissioning support Snowy 2.0

Construction and commissioning support Snowy 2.0

Test, commission and operate high voltage network – hydroelectric PROJECT OVERVIEW The Snowy Hydro 2.0 project involves linking two existing dams, Tantangara and Talbingo, through 27km of tunnels and building a new underground power station. The Snowy Hydro 2.0 project will provide an additional 2,000 megawatts of dispatchable, on-demand generating capacity and approximately 350,000 megawatt […]

Design, fabrication, erection, calibration, testing and commissioning – Fiji

Design, fabrication, erection, calibration, testing and commissioning – Fiji

VUDA TERMINAL FIJI PROJECT OVERVIEW RSGx, through acquisition performed the design of the Vuda ULP 2800m3 (Nominal) Tank. The project, located around 120Km’s North West of Suva is one of 6 storage facilities in Fiji, with the main terminals located at Walu Bay and Rodwell Road in Suva and Vuda Point in Lautoka. The D&C […]

Curtis Island: QCLNG and APLNG

Curtis Island: QCLNG and APLNG

Maintenance and specialised labour supply – Oil & Gas PROJECT OVERVIEW RSGx was awarded with the maintenance of GE equipment and labour supply of experienced personnel on the APLNG & QCLNG project at Curtis Island, Queensland. Our brief was to provide: Management level support staff including Supervisors and GE Equipment Specialists Supply of instrument and […]