Construction of the 220 66kv FMG Kanyirri substation and associated 66kv distribution cable to hidden tiger substation

Construction of the 220 66kv FMG Kanyirri substation and associated 66kv distribution cable to hidden tiger substation

PROJECT OVERVIEW The 220/66kV Kanyirri Substation and associated 66kV Distribution forms part of FMG’s new renewable network and will feed FMG’s Port operations in Port Hedland. SCOPE OF WORK Construction of the 220/66kV Kanyirri Substation and the associated 66KV distribution cable system out to Hidden Tiger Substation Kanyirri Substation Scope included: Procurement of all substation […]

Design, Construction and Commissioning services on the Boral Batch Plant for Northeast link

Design, Construction and Commissioning services on the Boral Batch Plant for Northeast link

PROJECT OVERVIEW The Northeast Link (NEL) is Victoria’s largest road project and represents the ‘missing link’ in Melbourne’s transport network. The project will connect the M80 with the Eastern Freeway linking key growth areas in the north and south-east. It includes upgrades to the Eastern Freeway, a dedicated Doncaster Busway, more than twenty-five kilometres of […]

CYP Melbourne Metro Tunnel Emergency Steel Walkway – Arden to ANZAC

CYP Melbourne Metro Tunnel Emergency Steel Walkway – Arden to ANZAC

PROJECT OVERVIEW The Metro Tunnel project is a $12.5 billion-dollar end-to-end rail line from Sunbury to Cranbourne/ Pakenham. SCOPE OF WORK The project team proposed a steel solution for the tunnel egress walkway, as an alternative to the traditional concrete system. The design prioritised constructability and considered modularisation to minimise onsite congestion and de-risk the […]